Sanctuary

Custom Home Builder, 2015 – 2016 Project

“The Sanctuary” consist of a maximum of 190 Private Preserves within the 1,300 acre track of land located on Lake Wylie with sites ranging in size from 2 to 13 acres with a strong emphasis on quality of design, compatibility among all improvements and the preservation of it’s natural habitat.  This beautiful home is a gracious and pleasing blend of natural materials nestled several hundred feet from the road side.

The winding driveway which blends naturally with the contours of the land leads to the home site surrounded by 8 acres of natures natural setting.  This elegant home with it’s 5 bedroom, 6 bathrooms will be appointed with fine custom trim work complementing it’s grand 10 foot high ceilings through out the home.  The numerous over sized windows allow the homeowners to feel apart of nature from within the comfort of their private living space.

  • 2-sanctuary lot
    Sanctuary lot
  • 1 – Diesel wears his hard hat
    Diesel wears his hard hat
  • 3 – new driveway entry
    New driveway entry
  • 4 – new drive looking back towards road
    New drive looking back towards road
  • 5 – new 300 foot drive to home site
    New 300 foot drive to home site
  • 6 – skid moving logs
    Skid moving logs
  • 7 – skid brings the loads to the road
    Skid brings the loads to the road
  • 8 – Skid loading logs at curb side to reduce sediment from leaving the site
    Skid loading logs at curb side to reduce sediment from leaving the site
  • 9 – loader clears the building envelope
    Loader clears the building envelope
  • Loader cuts grade for new foundation
    Loader cuts grade for new foundation
  • Poured footings
    Poured footings
  • Foundation form setting
    Foundation form setting
  • Concrete pump truck
    Concrete pump truck
  • Foundation Forms being filled with concrete from pump truck
    Foundation forms being filled
  • Spray foundation Sealant
    Spray foundation sealant
  • Foundation water drainage
    Foundation water drainage
  • Back fill
    Back fill
  • Plumbing rough and washed stone
    Plumbing rough and washed stone
  • vapor barrier before concrete pour
    Vapor barrier before concrete pour
  • Temporary drive and parking area
    Temporary drive and parking area
  • Poured conrete basement slab
    Poured conrete basement slab
  • Basement-framing
    Basement framing
  • First floor framing
    First floor framing
  • First floor framing 2
    First floor framing 2
  • Second floor framing
    Second floor framing
  • Roof framing
    Roof framing
  • Roof sheathing
    Roof Sheathing
  • Frame completion front elevation
    Frame completion front elevation
  • Frame completion rear elevation
    Frame completion rear elevation
  • Retaining wall preparation
    Retaining wall preparation
  • Window install
    Window install
  • Brick install
    Brick install
  • 2-sanctuary lot
  • 1 – Diesel wears his hard hat
  • 3 – new driveway entry
  • 4 – new drive looking back towards road
  • 5 – new 300 foot drive to home site
  • 6 – skid moving logs
  • 7 – skid brings the loads to the road
  • 8 – Skid loading logs at curb side to reduce sediment from leaving the site
  • 9 – loader clears the building envelope
  • Loader cuts grade for new foundation
  • Poured footings
  • Foundation form setting
  • Concrete pump truck
  • Foundation Forms being filled with concrete from pump truck
  • Spray foundation Sealant
  • Foundation water drainage
  • Back fill
  • Plumbing rough and washed stone
  • vapor barrier before concrete pour
  • Temporary drive and parking area
  • Poured conrete basement slab
  • Basement-framing
  • First floor framing
  • First floor framing 2
  • Second floor framing
  • Roof framing
  • Roof sheathing
  • Frame completion front elevation
  • Frame completion rear elevation
  • Retaining wall preparation
  • Window install
  • Brick install

Front Elevation

Sanctuary home plan front
 

Rear Elevation

Sanctuary home plan - left elevation

Malcare WordPress Security